What if the subfloor is moist, or the concrete isn't dry enough?

Livyn

What if the subfloor is moist, or the concrete isn't dry enough?

Make sure that the root cause of the moist subfloor is solved first. Then, apply a liquid, damp-proof membrane (liquid DPM). If you want to glue down your vinyl floor, you will need to use a levelling compound, as a porous substrate is required for the glue. 

Related subjects
Everything you need to know about Quick-step laminate flooring.

An extensive FAQ about Quick-step timber flooring.

The most commonly asked questions about Quick-step bamboo flooring.

From installation to maintenance and repairs: the most frequently asked questions about Quick-Step accessories.