Install Quick-Step Laminate on an existing floor?
ON A DAMP-POROUS FLOOR COVERING
First remove any damp-porous floor covering (i.e. carpet, needle felt, etc.) before installing the Quick-Step Laminate.ON A DAMP-SEALER FLOOR COVERING
Damp-sealed floor covering (PV, linoleum, VCT, etc.) doesn't have to be removed but a Quick-Step levelling underlay should be installed.ON A WOODEN SUBFLOOR
When you have a wooden subfloor, you have to remove every existing floor covering first.Important:
- No signs of mould and/or insect infestations should be present.
- Make sure the subfloor is level.
- Nail down any loose parts.
When you have an uneven timber floor, you must install the Quick-Step underlay Thermolevel. Also, there must be sufficient ventilation in the crawl space underneath the timber floor. The moisture content of the wood must not exceed 10%. Install the new floor at ninety degrees to the existing subfloor.
For more detailed instructions, contact our technical services department.